by Planning Engineer (Russ Schussler)
In October of 2024, the isolated small city of Broken Hill in New South Wales, Australia with a 36 MW load (including the large nearby mines) could not be reliably served by 200 MW of wind, a 53 MW solar array, significant residential solar, and a large 50 MW battery all supplemented by diesel generators.
